A standard installation will typically takes 3 -4 hours If your fuse box / electric meter is far from the charge point location or cables need to be run through internal rooms, the installation may take a little longer.

Our standard installation package includes the following:

The fitting of the charge point on a brick or plaster wall, or to another suitable permanent structure.
Up to 10 metres of black cable, run and neatly clipped to the wall between the distribution board / electricity supply meter and the charge point.
Drilling through one wall with a debth of upto 400mm
The fitting and testing of electrical connections and protections required for the charge point.
An additional consumer unit, if required.
Installation of circuit protection in keeping with BS7671 regulations.

To find out more check out our EV Home Charger Installation Process